Radial Engine Time Between Overhaul: What’s My TBO for the R-985 & R-1340?

 

Please allow me to offer some information in regard to Pratt & Whitney R-1340 & R-985 engine Time Before Overhaul intervals (TBO’s) for engines utilized on current agricultural aircraft. A letter from Pratt & Whitney (P&W) faxed to the Federal Aviation Administration (F.A.A.) dated February 13, 1990 is useful in understanding the organization’s corporate position on the radial engine.

AT-302
Ayres AT-301 Air Tractors VH-ODB and VH-ODM at Tintinara SA in May 1989
Designed by Leland P. Snow, the AT-302 designation indicates 320 gallon hopper and P&W R-1340 radial engine
From http://www.goodall.com.au/photographs/aerial-agriculture-80-1/80saerialag-1.html

“Pratt & Whitney have no company or F.A.A approved methods for providing any engineering substantiation or manual/publication revision relating to new methods or procedures which are being accomplished by operators and overhaul shops on Pratt & Whitney reciprocating engines.”

This letter establishes a, “hands off” attitude on P&W’s part concerning the Reciprocating Radial engines. Oil consumption is a major issue and is addressed in a cautionary statement constituting part of the P&W TBO considerations given in the R-1340 & R-985 overhaul manual (part number 123440).

“Oil consumption is usually one of the best indications as to whether or not the engine requires overhaul, provided the engine is performing normally and there is no indication of possible trouble or irregularities requiring more than normal line maintenance attention. A sudden increase of oil consumption or a gradual increase of oil consumption to double that which has previously been average, is usually case for overhaul.”

The engine’s primary accessories (Carburetor, Fuel pump, Magnetos, Starter, Propeller Governor, and Generator) are designed to run to engine TBO. It is our recommendation that they be overhauled at the same TSO as the engine. Ref: AC65-12A Chapter 10 Page 411 Par. Major Overhaul Our basic TBO recommendations are 1000 to 1400 hours operating time since overhaul. In order to determine this “recommended” Time Before Overhaul we have taken into consideration all forms of Agricultural utilization of the R-1340 & R-985 engine and have averaged the operating time between overhauls of engines submitted to us for overhaul over the last 25 years.

Weatherly 620A VH-WEA
Manufactuered in 1989, Weatherly 620A VH-WEA is powered by a 9-cylinder, Pratt & Whitney R-985 radial engine however the aircraft itself has a relatively low spraying capacity of 1200 litres. From http://airqueensland.blogspot.com/2015/01/r-mach-aviation_7.html

It must be noted that there is an Airworthiness Directive 68-09-01 issued to the R-985 engine. It is concerning Crankshaft flyweights and flyweight liner replacement. This AD mandates that it be accomplished at 1200 or 1600 hrs depending on propeller installation. In order to accomplish this, the engine must be disassembled to the point it is more economically feasible to overhaul than to limit to repair and replacement only. This Time Before Overhaul recommendation is made with the assumption that all manufacturers’ recommended/required periodic inspections are complied with in a timely manner throughout the life of the engine. This recommendation is not to certify or guarantee that an operator will achieve a specific number of hours operation time before an overhaul is necessary. This TBO recommendation should in no way be considered a maximum TBO limit as it is possible to safely operate an R-1340 & R-985 past 1200 or 1400 hours TSO. It is merely a RECOMMENDATION that, hopefully, will better enable an operator to develop a safe, economic engine overhaul schedule.

Related posts:

Share and Enjoy

  • Facebook
  • Twitter
  • Delicious
  • LinkedIn
  • StumbleUpon
  • Add to favorites
  • Email
  • RSS

Leave a Reply

Your email address will not be published. Required fields are marked *